ENVIRONMENTAL MANAGEMENT PROGRAMME AND SITE LAYOUT: KOUP 2 WIND ENERGY FACILITY, WESTERN CAPE PROVINCE
20 September 2024
NOTIFICATION OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL MANAGEMENT PROGRAMME AND SITE LAYOUT FOR PUBLIC REVIEW AND COMMENT
DFFE Reference: 14-12-16-3-3-2-2121
Nature of Activity: Genesis Koup 2 Wind Farm (Pty) Ltd, received environmental authorisation (EA) to develop the Koup 2 Wind Energy Facility (WEF) and associated infrastructure. The EA includes approval for the development and operation of a WEF, a Battery Energy Storage System (BESS), and associated infrastructure.
The Environmental Management Programme (EMPr) for the development (ERM, 2024) represents the updates to the previous EMPr submitted with the Final EIA Report (SiVEST, 2022) and is prepared as part of the requirements of the EIA Regulations promulgated under the National Environmental
Management Act 107 of 1998 (NEMA, 1998), as amended. The EMPr outlines measures to be implemented in order to minimise adverse environmental degradation associated with the various phases of the development. It provides a set of guidelines for the environmental management of all works executed by the Developer, Engineer, Contractor and Sub-contractor/s to have a minimum impact on the environment in accordance with all relevant legislation, policies and standards.
An additional 30-day scoping Public Participation period will be undertaken to ensure compliance with the regulations and will augment the public participation process that was undertaken during the previous application process.
Development Location: The proposed Koup 2 Wind Energy Facility (WEF) and associated infrastructure, located near the town of Beaufort West in the Beaufort West and Prince Albert Local Municipalities, which falls within the Central Karoo District Municipality of the Western Cape Province.
Invitation to Comment: Members of the public, local communities, and stakeholders are invited to comment on the EMPr and Site Layout, which is available for public review and comment, from Friday, 20 September 2024 until Tuesday, 22 October 2024 (both days inclusive), as per Table 1 below.
Table 1: Public Review and Comment Locations
Hard Copy / CD Copy Location |
|
Library |
Beaufort West Library, 15 Church Street, Beaufort West, Western Cape, South Africa |
Electronic Copy Locations (Available for download below) |
|
Via One Drive |
I&APs can request for copies to be sent via one drive shared folder. |
CD Copies will be made upon request to the EAP. |
Should you wish to be registered as an I&AP and / or would like comment please submit your name, interest in the project or comment, email and postal address and telephone number in writing to the below address: |
|
Environmental Resources Management Southern Africa (Pty) Ltd |
|
Project Reference: 5200 Koup 1 and 2 WEF |
Contact Person: Lucien Barbeau |
Email: ERM.Project5200Koup1&2@erm.com |
Telephone: +27105963451 |
Documents
Appendix A Generic EMPr for Substation and Powerlines.pdf
Appendix B Figures.pdf
Appendix C Environmental Authorizations.pdf
Appendix D Specialist Reports.pdf
Koup 2 Final EMPr September 2024.pdf